Multidisciplinary Commissioning & Startup Services for Data Centers and Industry
Projects

High Purity Gas systems Analytical tests for Tool installation Project
Analytical tests for High Purity & CFOS process piping of HPM & Non HPM gas systems in tool install project, including Helium leak check, Moisture, Oxygen & Particle Counting for 83 tools.

Waste treatment plant in Hungary
Waste treatment plant Design Build project in Hungary on behalf of Aqwise Smart Water Technologies Ltd. The project includes design and build of a new waste treatment plant for the Plastic production industry in Tiszaújváros Hungary including multidisciplinary programming of quality system and procedure to comply with the European standards.

Tool Installation Project - Diamonds Industry
Quality Assurance project of new production plant construction and tool install for the diamonds industry: the project included installation inspection for production plant and laboratories in clean and controlled environment including all required utilities.

Electrification of the Israeli train
Electrification project of the Israeli train (TS project) including multi disciplinary Quality Control, DC and Startup & Commissioning services for 14 GIS substations that are being constructed gradually until 2025 Project Budget ~450 M Nis

Intel Sparrow Cx Services
Cx Plus is providing commissioning and startup services for Lotus at Intel Sparrow Project – Developed the Cx Process and MOO, EXTO Dev and SSM, leading activities at the field cross discipline preforming OAT & FAT. 2MODs of ~ 600,000 SF of cleanroom space for the manufacturing of wafer chips. To support the cleanroom and tool install, the project include a CUB, PSSS, SUT, Utility Level, Sub Fab Level, and Cleanroom. Cx Plus Provides operational and functional testing services to Intel across the engineering disciplines at the Sparrow project, CSA, Electrical, Mechanical, Process, LSS, I&C.

Mobileye Global Development Center QC & Commissioning
Commissioning & QC for Mobileye project in Jerusalem
130,000 sqm,8 buildings complex “Gold Leed” standard, 7 floors of underground parking, 4 Mw Data Center, Smart building systems
Project Budget: 1 Bil Nis

AMIL
Quality Control & Certification testing for 3 Phases of Expansion project in Applied Materials PDC2 facility Conversion of storage area to operating cleanroom including utilities, piping systems, HVAC, Clean Arch and CR certification testing Project budget ~300 M $

Desalination Plant Construction
Quality Assurance for the SPC in construction of Seawater Desalination Plant in Ashdod, providing capacity of 100 million cubic meters per year. Project included construction of 38 buildings and complex infrastructures – pumping station, pipelines, filtration plant, reverse osmosis plant, post treatment plant, effluent plant, substation, water tanks and reservoirs, vast amount of utilities and electro-mechanical systems, office buildings, laboratory, infrastructures, roads, etc.

Semiconductor LC2 Conversion
Semiconductor LC2 construction Project Quality Management, Quality Assurance and Quality Control on behalf of Exyte: Design Build Project which included multidisciplinary quality services
the project included a conversion of the LC2 building to production area including clean rooms & Subfab

Tlv 62- Data Center
Commissioning for a 15 MW Data Center (TLV 62) located in Israel for a global client, including L0-L5 commissioning across various disciplines. Commissioning services include load bank testing, IST, IR scanning, and all other tests as per client specifications.

JOL- Jerusalem of light- Data Center
Commissioning for a 3 MW Data Center (Jerusalem of Light), a project converting an existing office building into a data center. Serving as the client's CxP for the L3-L6 steps, responsibilities include writing all L3, L4, and L5 test checklists. Additionally, we implemented our QCx Plus management software to handle checklist signoffs and track discovered issues, enabling us to assign tasks directly to specific contractors for resolution, review, and final closure.

Tlv 80- Data Center
Commissioning for Data Center Project located in Israel (TLV 80) O.B Davenham for electrical system installed in the project. The commissioning included L2-L5 on site commissioning services according to the vendor procedure, client specifications and local codes.

Lusix
Commissioning, QA/QC and Analytical tests for 450 Tools including: High Purity & CFOS Process Piping systems in the Lab Grown Diamonds industry for Lusix a part of Landa Group Project Budget : 900 M Nis

Merkavim- Data Center
Commissioning for a 10 MW project (Merkavim) located in Petah-Tikva for a global client. Serving as the client's CxP, responsibilities cover all commissioning activities, from design review through L1 and up to final handover.

Sparrow Cx
2MODs of ~ 600,000 SF of cleanroom space for the manufacturing of wafer chips. In order to support the cleanroom and tool install, the project will include a CUB, PSSS, SUT, Utility Level, Sub Fab Level, and Cleanroom.
Q Plus Provides operational and functional testing services to Intel across the engineering disciplines at the Sparrow project, CSA, Electrical, Mechanical, Process, LSS, I&C.